Roth Technik AG

Unterdorfstrasse 2
8588 Zihlschlacht-Sitterdorf
Switzerland

+41 41 500 27 73
E-Mail

Follow us!

Ariba

Back to the overview

10134 Second stage of the twin system Robot hanging in front of CNC milling machine

The first system (10058) was realised about a year ago. At that time, the steel structure was designed for two robot cells.

Updated on 28.10.2021

10134 Second stage of the twin system Robot hanging in front of CNC milling machine

The first system (10058) was realised about a year ago. The steel construction was designed for two robot cells. We were now able to realise the second half of this twin system, with a Fanuc robot suspended from a steel structure in front of a CNC milling machine. Parts are fed and removed in pallets with mould nests on conveyor belts. There is a lift between the conveyor belts. A third belt is used to remove parts that can no longer be put back into pallets. Smart Automation by Roth Technik.

More projects

{{titel_en}}

{{kurzbeschreibung_en}}

Arrange a personal consultation

Markus Roth

Markus Roth

CEO, Sales

+41 41 500 27 73
E-Mail

Roth Technik AG

Unterdorfstrasse 2
8588 Zihlschlacht-Sitterdorf
Switzerland

+41 41 500 27 73
E-Mail

Follow us!

Ariba
Copyright © | created with ♥︎ by express design